Cold Spring Ranch
- Introduction
- Boundary
- Land Use
- Buffers/Open Space
- Environmentally Sensitive Lands
- Storm Drain
- Pressurized Irrigation
- Culinary Water
- Sewer
- Power
- Transportation
- Geotechnical
- Fiscal
Holbrook Farms
- Boundary
- Buffers Narrative
- Buffers Plan
- Environmental
- Fiscal
- Geotechnical Study
- Introduction
- Land Use
- Pressurized Irrigation
- Power
- Sewer
- Storm Drain
- Transportation
- Water
Traverse Mountain Area Plan
- Boundary
- Bulk & Intensity
- CC&R’s
- ByLaws
- Architectural Guidelines and Revised Fencing
- Community Guidelines
- Notice of Obligation
- Approved Plant List
- Culinary Water
- Design Standards Variations
- Development Code Variations
- Environmental & Mass Grading
- Fiscal
- Land Use
- Parks & Recreation
- Power & Gas
- Pressure Irrigation
- Sanitary Sewer
- Solid Waste
- Storm Drain
- Table of Uses
- Traffic Study
Gray Farms
Ivory Ridge
Pilgrim’s Landing
Pointe Meadow
Skye Area Plan (Micron)
- Introduction
- Land Use
- Utilities
- Transportation
- Geotechnical
- Geotechnical Area 1
- Geotechnical Area 2
- Geotechnical Area 3
- Geotechnical Area 4
- Geotech Debris Flow Study
- Geotech Fault Rupture Study
- Fiscals
- Amendments 08.27.24
Spring Creek Ranch
Thanksgiving Point (New 8/8/23)
- Introduction
- Maps
- Legal Description
- Traffic Improvements
- Table of Bulk & Intensity
- Thanksgiving Station Requirements
- Thanksgiving Station Design Standards
- Power Gear Placement
- Bike Facilities Map
- Water Dedication
- Resort Community Zone
- Utilities
- Fiscal
- Table of Uses
Lehi Frontrunner Station Area Plan
Planning Division
153 North 100 East
Lehi, UT 84043
Phone: 385.201.1000
Office Hours
Monday-Friday
8 a.m. to 5 p.m.